Installation Procedures

See Deployment Checklist for step-by-step installation guide.

Installation Overview

Duration: 2-3 hours on-site

  1. Physical Installation (30 min)
  2. Replace existing router
  3. Connect WAN and LAN cables
  4. Power on and verify LEDs

  5. Configuration Upload (20 min)

  6. SSH to router
  7. Upload OpenClash config
  8. Set permissions

  9. Service Start (10 min)

  10. Start OpenClash
  11. Verify process running

  12. Testing (60 min)

  13. Verify proxy health
  14. Test domestic sites (direct)
  15. Test international sites (proxied)
  16. Configure WiFi
  17. Test customer devices

  18. Training & Handoff (30 min)

  19. Customer training
  20. Documentation delivery
  21. Acceptance sign-off

For complete installation procedures, see Deployment Checklist.